About the product
The application of our Soil Treatment follows the sequence of procedures stated as follows:
A.) Foundation Treatment: Prior to pouring foundation, apply termiticide solution per square meter of surface (bottom and side) of excavations for footings and foundations.
B.) Floor slab treatment: Prior to placing of vapor barrier, apply termiticide solution per sq. m of the sand bedding directly under the concrete slab.
A.) Foundation Treatment: Prior to pouring foundation, apply termiticide solution per square meter of surface (bottom and side) of excavations for footings and foundations.
B.) Floor slab treatment: Prior to placing of vapor barrier, apply termiticide solution per sq. m of the sand bedding directly under the concrete slab.
Price
100
Contact with supplier