SM North EDSA

About the product
SM North EDSA (1.5MW)
SP and SM Prime Holdings Inc. entered into a Lease Agreement on June 2014 to rent the top floor of the SM North EDSA parking building for a 1.5MW solar plant. The project was fully financed by Solar Philippines, with a term loan from Chinabank. Under the Feed-in-Tariff-Lease (FIT-Lease) model, energy is fed to the grid at the rate of ₱9.68 per kWh.
Contact with supplier
BACK TO TOP